Frame
Verify that the frame is clean and construction is sound (no weld breaks, missing supports, etc.
- Clean, Paint & Modify as needed
Electrical
Confirm that all electrical housings, components, wiring and controls are clean, neat, properly sized and/or identified and in good functional condition. Performance test entire unit to verify correct programming and confirm proper operation of all electrical and mechanical components (ie, pumps, actuators, PLC, HMIs, relays, etc.)
- Enclosures
- PLC
- Disconnects
- HOA
- HMI, OIT, etc.
- Components (Relays, TBs, fuses, etc.)
- Motor Starters
Instrumentation
Check that all required meters and probes are installed and in good working condition.
- Flow Control
- TDS
- PH
- ORP
- Disconnects
- HOA
- HMI, OIT, etc.
- Components (Relays, TBs, fuses, etc.)
- Motor Starters
Plumbing
Verify that all piping is sized and rated correctly for the application. Repair or replace any piping showing signs of cracking, fatigue or failure. Check that all valves are mounted properly and in good working condition. Examine all indicators to ensure that they are mounted in easily accessible locations, are sized appropriately for the application and are functioning properly. Verify that all air distribution piping and solenoids are working correctly with no leaks at the required pressure ratings.
- Piping
- Low Pressure
- High Pressure
- Reject
- Permeate
- Valves
- Low Pressure
- High Pressure
- Reject
- Permeate
- Other
- Indicators
- Chem Pump
- Air Dist.
- Test Connections
Vessels
Confirm that all end caps, 1.125” end adapters and thrust cones are functional and installed correctly.
- End Caps
- End Adaptors
- Interconnectors
- Straps
Feed Pump
Performance test the feed pump for proper pressure and flow rates. Check that bearings and seals are working properly. Ensure that the motor is wired for correct voltage phase application and is functional.
- Bearings & Seal
- Impellers
- Motor
Filter Housing
Inspect, clean or replace the prefilter housing, plates, springs, rods and/or filters as required.
- Replace Filter Housing
- Plates
- Springs
- Rods
- Filters
Maintenance
Ensure installation and placement of appropriate drain fittings and any CIP fittings which may be necessary for easy machine maintenance.
- CIP fittings
- Drain fittings
Design/Documentation
Compile required documentation for correct end user installation and operation.
- Skid drawings
- Wiring diagrams
- Enclosure layouts
- SOO
- Operating Manuals
- Documented PLC Code
- Component Spec Sheets and Vendor Manuals
Shipping & Handling
Ensure we have recorded the weight and dimensions of the equipment. Ensure that any loose parts are boxed and tagged with each unit.
- Weight
- Dimensions
- Packaging